The first brake arm of a new set. This is the same design as the previous set but with the CNC program tweaked a bit.
The brake arm will be cut from the block with a bandsaw, deburred and cleaned up. The slot for the brake pad still has to be machined, along with a few other operations.
My machined bicycle components will be detailed in this Blog. I design and machine all the components myself. A lot of this work is done manually and the parts are usually 'one offs' or low quantity.
Thursday, 24 November 2011
Saturday, 19 November 2011
Quick Release Skewers - Complete :)
The quick release skewers are now finished and in use. The final lever profile changed quite a bit from the original. The final profile is much more hand friendly. These will go for black anodising the next time I get some done.
The final nut profile also changed, the nut is a bit bigger and the profile was machined with a ball nose cutter to give a rounded profile at the bottom of the grip area.
Sunday, 2 October 2011
Quick Release Proto
My prototype quick release skewer, a bit rough and ready, the lever design will be tweaked before making a new (hopefully final) set.
I am happy with the profile of the nut side; it matches the brake cable barrel adjusters I made. I may increase the size slightly on the next version.
I am happy with the profile of the nut side; it matches the brake cable barrel adjusters I made. I may increase the size slightly on the next version.
Tuesday, 20 September 2011
brake cable carrier hanger thingy
I got a few 'cable carriers' done all in black when I had the cyclocross brakes anodised. Here is one such carrier in its new happy home, happily carrying cable:
Just have to make the brakeset to match now. Material ordered today, but other 'inventions' are holding up progress on my next set of brakes.
Just have to make the brakeset to match now. Material ordered today, but other 'inventions' are holding up progress on my next set of brakes.
Saturday, 10 September 2011
Finished Cyclocross brakes
The latest brakes finally fitted to my cyclocross bike. They are working well and stopping shouldn't be an issue this season, though going fast enough will :)
The brake cable hanger is shown below, this is a lot stiffer than the original and the cable routing is nice and smooth.
The brake cable adjusters are shown below, when the brake pads wear the brakes can be re-adjusted by turning the red barrels. One cable ferrule came back from the anodisers red, and one black..... oh well.
The brake cable hanger is shown below, this is a lot stiffer than the original and the cable routing is nice and smooth.
The brake cable adjusters are shown below, when the brake pads wear the brakes can be re-adjusted by turning the red barrels. One cable ferrule came back from the anodisers red, and one black..... oh well.
Red n black
After the brakes had their bearings and springs assembled they were fitted to my cyclocross bike. This picture shows one brake arm attached, ready for brake pad and cables.
Wednesday, 7 September 2011
Brake Assembly
When all the bits and pieces returned from anodising, the brake assembly could begin. Two sealed bearings are pressed in to each brake arm and 'spring stop' bolts fitted to the back of the arms. There are a few other jobs to do.... but almost complete.